Industrial & Technology
-
FORUM ENERGY | New Iberia, Louisiana
Cost: $15,000,000| Square Feet: 156,300
Project included design of new 130,010 square foot machine shop and 26,330 square foot office building. Mechanical design included sprinkler, plumbing, HVAC and general ventilation for the office areas, and sprinkler, plumbing, HVAC, shop ventilation, and heating for the manufacturing shop. Total air conditioning load for this facility was 525 tons. Shop plumbing consisted of domestic water piping, gas piping for heating and equipment, and compressed air piping.
-
FORUM ENERGY | New Iberia, Louisiana
Cost: $15,000,000| Square Feet: 156,300
Project included design of new 130,010 square foot machine shop and 26,330 square foot office building. Mechanical design included sprinkler, plumbing, HVAC and general ventilation for the office areas, and sprinkler, plumbing, HVAC, shop ventilation, and heating for the manufacturing shop. Total air conditioning load for this facility was 525 tons. Shop plumbing consisted of domestic water piping, gas piping for heating and equipment, and compressed air piping.
-
FORUM ENERGY | New Iberia, Louisiana
Cost: $15,000,000| Square Feet: 156,300
Project included design of new 130,010 square foot machine shop and 26,330 square foot office building. Mechanical design included sprinkler, plumbing, HVAC and general ventilation for the office areas, and sprinkler, plumbing, HVAC, shop ventilation, and heating for the manufacturing shop. Total air conditioning load for this facility was 525 tons. Shop plumbing consisted of domestic water piping, gas piping for heating and equipment, and compressed air piping.
-
K&B MACHINE | Shriever, Louisiana
Cost: $7,800,000| Square Feet: 204,900
Project included design of new 189,510 square foot manufacturing facility with offices and 15,400 square foot office building. Mechanical design included plumbing, HVAC ventilation, and heating for the manufacturing facility. The offices and machine shop air conditioning systems consisted of chillers, pumps, variable volume air handling units, air rotation units in shop and high volume low speed fans. Air conditioning load for this facility exceeded 400 tons. Shop plumbing consisted of domestic water piping, emergency eyewash and eyewash/showers, gas piping for heating and equipment, and compressed air stations.
-
K&B MACHINE | Shriever, Louisiana
Cost: $7,800,000| Square Feet: 204,900
Project included design of new 189,510 square foot manufacturing facility with offices and 15,400 square foot office building. Mechanical design included plumbing, HVAC ventilation, and heating for the manufacturing facility. The offices and machine shop air conditioning systems consisted of chillers, pumps, variable volume air handling units, air rotation units in shop and high volume low speed fans. Air conditioning load for this facility exceeded 400 tons. Shop plumbing consisted of domestic water piping, emergency eyewash and eyewash/showers, gas piping for heating and equipment, and compressed air stations.
-
K&B MACHINE | Shriever, Louisiana
Cost: $7,800,000| Square Feet: 204,900
Project included design of new 189,510 square foot manufacturing facility with offices and 15,400 square foot office building. Mechanical design included plumbing, HVAC ventilation, and heating for the manufacturing facility. The offices and machine shop air conditioning systems consisted of chillers, pumps, variable volume air handling units, air rotation units in shop and high volume low speed fans. Air conditioning load for this facility exceeded 400 tons. Shop plumbing consisted of domestic water piping, emergency eyewash and eyewash/showers, gas piping for heating and equipment, and compressed air stations.
-
NATIONAL OILWELL VARCO | St. Martin Parish, Louisiana
Cost: $18,000,000| Square Feet: 156,300
Project included design of new 137,670 square foot shop and 18,655 square foot office building. Mechanical design included sprinkler, plumbing, HVAC and general ventilation for the office areas, and plumbing, HVAC, shop ventilation, and heating for the shop. Shop plumbing consisted of domestic water piping, gas piping for heating and equipment, and compressed air piping. Site plumbing design consisted of extended domestic water, sewer, and gas services to the existing utilities on site.
-
NATIONAL OILWELL VARCO | St. Martin Parish, Louisiana
Cost: $18,000,000| Square Feet: 156,300
Project included design of new 137,670 square foot shop and 18,655 square foot office building. Mechanical design included sprinkler, plumbing, HVAC and general ventilation for the office areas, and plumbing, HVAC, shop ventilation, and heating for the shop. Shop plumbing consisted of domestic water piping, gas piping for heating and equipment, and compressed air piping. Site plumbing design consisted of extended domestic water, sewer, and gas services to the existing utilities on site.
-
NATIONAL OILWELL VARCO | St. Martin Parish, Louisiana
Cost: $18,000,000| Square Feet: 156,300
Project included design of new 137,670 square foot shop and 18,655 square foot office building. Mechanical design included sprinkler, plumbing, HVAC and general ventilation for the office areas, and plumbing, HVAC, shop ventilation, and heating for the shop. Shop plumbing consisted of domestic water piping, gas piping for heating and equipment, and compressed air piping. Site plumbing design consisted of extended domestic water, sewer, and gas services to the existing utilities on site.